For nearly 20 years, Meyer has been a trusted partner to the University of Connecticut. Not for one thing. Not for a specific type of project. But for the full breadth of what a growing research university needs: from relocating specialized lab equipment to residence hall renovations, from art collection moves to executive suite projects. From the most delicate artifacts to the most complex technical equipment.
That versatility is what makes Meyer different. UConn doesn’t have to manage multiple vendors for different project types. One partner that knows the campus, understands the complexity, and handles it all, whether it’s moving a museum collection, or renovating the President’s office.
The Full Spectrum of Campus Operations

Consider the Ballard Institute and Museum of Puppetry. Moving 2,000+ handcrafted puppets and cultural artifacts isn’t a typical relocation project. Each piece is valuable. Each is fragile. Some are irreplaceable. Meyer managed the entire job with specialized handling, careful packing protocols, and deep understanding of preservation requirements. This wasn’t logistics—it was curatorial expertise paired with moving excellence.
Then there are the labs. The Gant Foundry, where engineers pour molten metals and conduct metallurgical testing. The C2E2 Clean Energy Lab, which required several months of careful coordination with specialized equipment. The Soils Testing Lab, recently relocated to a modern facility where the public can bring in soil samples for analysis. Biosafety hoods and cabinets that demand precision decommissioning and handling of sensitive materials. Meyer handles work that goes far beyond traditional moving, requiring technical knowledge and careful execution.

Last summer, Meyer orchestrated a major North Campus dormitory renovation. Three buildings. Four floors each. All stairs. No elevators. The team carefully removed furniture from every dorm room, loaded 26 tractor trailers for storage over the summer, and coordinated the precise return after painting and lighting upgrades were complete. The timing was critical: move out immediately after graduation in May, bring everything back before students arrive in August. The scale, the physical demands, and the required coordination showed Meyer’s capability to manage complex, multi-phase operations.

And then there are the high-stakes projects. Recent renovations of the President’s office required a different kind of expertise—attention to detail, discretion, and the understanding that this space represents the university’s leadership. Meyer handled this with the same professionalism and precision they bring to every project, no matter the scale or visibility.
Beyond these major projects, the work never stops. Office relocations between multiple campuses. Classroom reconfigurations. Furniture moves. Patio equipment transfers. Some planned months, and in some cases, years in advance. Some requested with short notice. Meyer handles them all with consistent professionalism.
Why Breadth Matters
Universities are complex ecosystems. Academic buildings, research labs, residence halls, athletic facilities, administrative offices, specialized museums, executive spaces. Each has different needs. Different challenges. Different expertise required.
UConn manages many smaller moves in-house with their own staff and equipment. But when a project requires stair carries, specialized packing, unusual equipment, complex coordination, or high-level project management, that’s when Meyer steps in. One trusted partner. One team that knows the campus intimately. One company that can handle anything from a delicate puppet collection to a metallurgical lab to a dorm renovation to the President’s office.
After nearly 20 years, that’s not just a vendor relationship. It’s a partnership built on trust, consistency, and the proven ability to handle whatever a university needs.